Navigation:Home >> Business >> Bridge And Tunnel
Reinforcement design of Tongling Yangtze River Hig
Published:2018/2/2

Tongling Yangtze River Highway bridge main span of cable-stayed bridge with double cable planes of the Twin Towers 432m prestressed concrete, the emphases and difficulties of this project, our company in the full research and master the basic structure of the bridge, accurate analysis, accurate calculation, the successful completion of the bridge inspection and repair truss girder bottom Prestressed construction design, cable replacement work.