First phase project of Hohhot Metro Line 1
Published:2018/2/5 9:58:06

The project is the East-West main line of Hohhot city. From Jinhai Industrial Park to Baita, it is 22.235km long (including the entry line), of which the underground line is 18.5km, the elevated line is 4.7km, the open section is 0.25km, and there are 19 stations, including 16 underground stations and 3 elevated stations. Our company assumes all the places The two stage design work of the upper section about 4.7km three stations and three intervals. The project began in early 2016 and started construction in May 2017.