First phase project of Foshan Metro Line 2
Published:2018/2/5 9:52:32

The project is the East and West trunk line connecting the Foshan center group and the Xijiang group, and links the rail transit line between Foshan and Panyu, Guangzhou. The first phase of the project is 32.1km long, with 6.27km of elevated section, 24.1km of underground section and 0.7km of transition section, with 17 stations, including 7 transfer stations, and the average distance between stations is 1.99km. Our company is responsible for the design tasks of most of the stations, sections and parts of the underground stations and workshops. The total investment was about 20 billion yuan. It began to be designed in December 2013 and started in June 2014.